Success Stories

Increased Efficiency at the New ABB Mega-Factory

ABB China asked us to help them with the setup of their new mega-factory. With good project management and partnership between ABB and Bossard, we were able to increase efficiency while decreasing processing costs.

The ABB office building in China

The Challenge: Finding Efficient Solutions for a New Factory

Our customer, ABB Robotics China, moved their factory to a new location. Until then, they had faced the following challenges within their production facility:

  • arduous manual material management process
  • no material transparency
  • limited forecast options

We were asked to design a solution for the new factory.

Our Solution: Ensuring Material Availability

After a profound analysis and calculations, we equipped five supermarkets at the customer's central storage location with our SmartBin Cloud solution. This fully automated system ensures material availability, thus relieving employees from having to worry about the availability of materials.

In addition, we installed Bossard Code systems at 17 points of use within workstations. Bossard Code simplifies the reordering of regularly used items. Thanks to these systems, ABB was able to increase its efficiency considerably.

Customer Benefits at a Glance

  • remarkable cost savings
  • reduced space usage
  • increased transparency of material flow
  • reliable supply of committed items
  • fully automated item management
Smart factory logistics icon

Become More Efficient with Smart Factory Logistics

Do you also want to increase efficiency in your factory? Discover our tailored solutions.

Learn More